Zimel Development, Unterägeri

Electric vehicle charging stations in condominiums.

As the homeownership rate rises, charging in condominiums is becoming increasingly important. The Zimel development in Unterägeri demonstrates how e-mobility is factored in from the planning phase onward—from the initial construction to billing.

Go to private charging
Zimel Development in Unterägeri with ZEV and " eCarUp " Charging Solution
The Installation at a Glance
Basic infrastructure in all parking lots Pico up to 22 kW Zero-Emission Vehicles (ZEVs) with PV systems

Planning

Planning is the be-all and end-all.

In residential buildings today, charging is generally limited to a maximum of 22 kW. Forward-thinking planning determines whether the charging infrastructure will remain future-proof and compatible. Charging stations from different manufacturers are usually incompatible, and usage-based billing is mandatory from the start.

The SIA 2060 guideline provides guidelines for building design. In the Zimel development, all parking spaces were equipped with a basic infrastructure. Condominium owners can use this to install their charging stations at any parking space as needed.

Private Charging In detail
Underground parking garage at the Zimel development with designated charging stations

Load Management

Optimize costs with smart load management.

Every property has a limited connection capacity. Multiple stations connected to the same service connection place a heavy load on the grid, which is why load management is essential.

Internal Load Management

The Zimel housing development features the " Pico " charging station. It automatically manages the load and distributes the three-phase charging power among all charging stations.

Multilevel Load Management

When integrated with the PV system, even more is possible: smart-me 's multilevel load management system models multiple buildings with different circuit protections and responds in real time to consumption and production.

Solar Power System at the Zimel Development for Pooling for Personal Consumption

The development's solar power system, the basis for the ZEV.

Pico Electric vehicle charging station with a ribbon cable in the underground parking garage

Pico Charging stations, connected via ribbon cables.

Billing

Flexible billing for condominium owners.

Visitors pay differently than owners. Both methods operate in parallel in Zimel without any administrative burden.

Credit Card for Visitors

eCarUp 's standard solution is in use at the visitor parking lots: simple, transparent billing via credit card. eCarUp charges a 10% commission per financial transaction.

ZEV with its own electricity

During the day, a large portion of the electricity is generated and consumed on-site; the surplus is fed into the grid. Billing for charging electricity is handled through smart-me Billing, and the operator sets the rates themselves.

Conclusion

Continue on the path to success.

The Zimel development demonstrates how charging stations can be implemented in a smart and future-proof way in condominiums. This makes charging at home easier, more affordable, and more sustainable.

Request a charging solution
  • Incorporate basic construction into the planning process, in accordance with SIA 2060
  • Plan for load management from the very beginning
  • Billing per user, automatically in the background
  • Use Your Own Solar Power Through the ZEV

Contact

Any questions?

Our team is here to help you. Please contact us for a personalized consultation.

eCarUp AG Riedstrasse 18
CH-6343 Rotkreuz

Send us a message

This form is protected by reCAPTCHA.